|
Pre-season preparation. |
||
|
The shell has been delivered. It's very lightweight. 15/12/02 |
The engine bay being prepared 20/12/02 |
The original petrol tank filler hole has been filled in and the new one created. |
|
The inside is as empty as it can get ready for the roll cage to be added. |
The roll cage has been fitted inside the car 05/02/03 |
showing the rollcage from the front of the car |
|
the cage has very hide sides to protect the drivers from a side impact |
the rollcage gives the car stiffness and stability |
|
|
the inside has been painted 09/02/03 |
the colour is a little brighter than last year |
next stop will be painting the outside |
|
outside all painted 12/02/03 |
next step is the wiring looms followed |
by the air jack lines and dashboard |
|
some of the control lines are in place 03/03/03 |
fire extinguisher, fuel system |
steering column and handbrake |
|
the dash is complete with all the control systems 29/03/03 |
the engine is nearly complete as the pistons have arrived 29/03/03 |
|